
The IRB ecosystem in 2025: central, local, commercial, institutional, and VA
Maps the five major IRB models as operational realities the RC must navigate simultaneously, analyzing their distinct characteristics and building a reference guide for portfolio-level IRB management.
Five IRBs, one portfolio, no margin for confusion
There was a time -- and it was not so long ago -- when the question "Which IRB reviews your studies?" had a simple answer. The institution had its own IRB, or the site used a single commercial board, and that was the universe. Every protocol went to the same body, following the same forms, on the same timeline, through the same portal. A coordinator could master one set of procedures and apply them uniformly.